Mahindra Rivenza Baner Annexe Metro Connectivity: Line 3 Stations
Evaluate Pune Metro Line 3 connectivity for Mahindra Rivenza Baner Annexe. Swift access to elevated metro stations connecting Hinjewadi Megapolis to Shivajinagar Court.
Zero-Car Rapid Transit Across Pune Urban Core
Pune Metro Line 3 is an ₹8,313 Crore high-speed elevated transit corridor connecting the western IT hub at Hinjewadi directly to the cultural and administrative heart at Shivajinagar. Mahindra Rivenza is strategically flanked by two Line 3 stations.
Residents can board at Balewadi Stadium Metro or Hinjewadi Phase 1 Metro station and travel across Pune University, Aundh, Baner, and Deccan without experiencing road traffic or parking hassles.
- ✓ Planned PMPML electric feeder bus loops connecting Mahalunge DP road to stations
- ✓ Transit-oriented development premium historically boosts rental yields by 1.2% to 1.8%
- ✓ Reduces carbon footprint in alignment with Mahindra Rivenza Net Zero living
Sculpted around the biophilic rhythms of the Mula River and Western Ghats bio-reserves.
- • Master Development: 13.46 Acres in Baner Annex
- • Greens & Biodiversity: 9+ Acres (70%+ Open)
- • Grand Clubhouse: ~44,000 Sq.Ft. with Sunken Aqua Bar
- • Typologies: Luxury 2, 3 & 4 BHK Residences
- • MahaRERA Registration: PR1261012602102
Frequently Asked Questions: Pune Metro Line 3 Connectivity
Which metro station is closest to Mahindra Rivenza Baner Annexe? ▼
The closest station is Balewadi Stadium Metro Station on Line 3, located approximately 3.2 km (5 to 7 mins) from the project.
Can I travel to Pune Railway Station and Airport via Metro Line 3? ▼
Yes, Line 3 interchanges with Pune Metro Line 1 and Line 2 at Shivajinagar District Court, allowing seamless connections across Pune.